Laying the foundations for Britania Bridge Primary School

We worked alongside Wates to support the construction of a 1,483m2 single-storey 210 pupil primary school located on a greenfield site in the centre of a housing estate. Our work consisted of external drainage including main sewer connection, attenuation tank installation, strip footing foundations, internal drainage, gas membrane installation, rebar mesh to slab alongside the full external works which included prep tarmac works, block paving to the front entrance, kerbs & pin kerbs to pathways & car park.

  • Location Britania Bridge, Wigan
  • Completion Date July 2016
  • Services Provided Civil Engineering
  • Project Duration 9 Months
Britania Bridge R&M Dev
Britania Bridge Primary School
Britania Bridge Primary School R&M Developments
Britania Bridge Primary School R&M Developments
Britania Bridge Primary School R&M Developments
  • Go to the Previous SlideGo to the Next Slide
  • Go to the Previous SlideGo to the Next Slide
  • Go to the Previous SlideGo to the Next Slide
  • ISO 9001
  • ISO 45001 R&M Developments
  • ISO 14001 R&M Developments
  • UKAS R&M
  • chas r&m development logo
  • construction line logo